Power System Analyst, Grid Intergration of Renewables and Thermal Power

Arbetsbeskrivning

Power System Analyst with focus on Grid Intergration of Renewables and Thermal Power Plants, Fredericia, Denmark


The Danish power system is undergoing significant technical changes. The green power system of the future will be significantly more complex and behave in a very different way compared to today. Energy production is taken over by technologies such as wind and solar, and in addition to this, an ever-increasing number of HVDC-based inter-connectors are established. Most recently, the need for national reliability of energy and power production has motivated new thermal plants, based on green fuels.. Energinet is the Danish system operator in facilitating the green transition and must ensure that the power system can be operated in a stable manner, today and in the future.

You will be part of an organisation where flexibility and work life in balance are high on the agenda. You will therefore be offered equipment for a good home workplace in order to be able to vary in the best possible way with being at our head office in Fredericia and at home.

Directly linked to the green transition

As a Power System Analyst in the Department Power System Design, you will contribute directly to the foundation of the Danish green transition. You will play an important role in the organisation, where you will be responsible for ensuring secure and reliable grid integration of a range of plant types. You will validate plant performance, ensuring valid simulation models, and conducting grid integration studies grid. Through that process you will interact with internal and external stakeholders involved.

Your key responsibilities are:
- Act as technical responsible for grid integration of cases with several technologies including synchronous generators, solar power plants, wind power plants, data centres and PtX-plants.
- Undertake power system plant integration studies using various analytical tools including phasor-based and electromagnetic transient tools (eg PowerFactory and PSCAD).
- Contribute to the continuous development of the Danish grid codes.
- Handle specification, performance verification and implementation of a range of different types of simulation models.
- Specify compliance-testing and -simulation requirements for new grid connections, with a special focus on new synchronous generators.

You can look forward to an exciting job with great responsibility, variety, and complexity. You will work closely with 14 highly specialized colleagues, and you will be at the centre of the decision-making to ensure the stability of the future green power system.

Power System Analyst

You hold a master's degree within Power System or Power Electronic engineering, combined with minimum 2-4 years of work experience either from the classic power plant, wind or solar industry or a TSO. You are specialized in simulation-based analysis and have experience within modelling of synchronous or power electronic interfaced plants. You have well-developed competencies within the use of DIgSILENT PowerFactory and PSCAD and programming skills, e using Python.

It is important that you like to work with advanced theory and are equipped with strong analytical skills and a well-developed critical sense. You work systematically, take responsibility, have personal impact, and can work independently. You are good at collaborating with different professional groups and at communicating complex issues in a clear and easy-to-understand language. You speak and write English fluently and preferably also Danish.

PLEASE NOTE: The job requires that you can obtain and maintain security clearance.


Application and contact
Send your application with CV and other relevant appendices via the link under "Ansøg om job" on this site:

https://energinet.dk/karriere/jobsogning/ledige-job/?jobId=186510

We will conduct interviews on an ongoing basis, and will close the recruitment, when we have found the right candidate.

If you have any questions about the job, you are welcome to contact Head of department, Christian Flytkjær, on telephone 0045 3067 4688.

We see diversity as a strength and encourage all qualified people, regardless of background, to apply for the job. We work actively and determinedly with diversity in Energinet and therefore encourage you to exclude information about age, marital status, etc. to minimise outage biases in the process. You can read more about our diversity policy here.



Energinet Eltransmission A/S is responsible for developing, building, owning and operating the necessary electricity transmission grid and making it available to the transmission system operator (TSO) with the right capacity and at the correct quality as cost-efficiently as possible, ensuring optimal and safe utilisation of the installations. We ensure optimal asset management by focusing on the installations' overall service life - from cradle to grave.

We are a subsidiary of the Energinet Group, which represents societal interests when supplying Denmark with electricity and gas and that the energy system is converted to green energy. Our culture is closely linked to our social responsibility, and we work actively with the UN's global goals on sustainable energy, climate action, partnerships for action as well as industry, innovation, and infrastructure. By leading the way in the green transition, we can help to solve the global climate challenge. New solutions require us to be able to see problems from many different angles, and diversity is therefore a keyword in our culture. We strive to listen to, involve and share our knowledge. Based on the values of courage and trust, we focus on constantly developing ourselves as an organisation and as people.

Read more at our website www.energinet.dk

See film about Energinet, https://vimeo.com/791144783

Sammanfattning

  • Arbetsplats: Energinet (ERS)
  • 1 plats
  • Tills vidare
  • Heltid
  • Fast månads- vecko- eller timlön
  • Publicerat: 24 maj 2023
  • Ansök senast: 18 juli 2023

Liknande jobb


15 november 2024

Gruppchef Nätutveckling

Gruppchef Nätutveckling

15 november 2024

15 november 2024

15 november 2024